关于济南电动门的安装步骤

2014-11-11 15:57:21      点击:
选定济南电动门式样规格型号长度后,根据现场门头土建的进度状况,购门单位要做好以下几个工作:
Selected Ji'nan electric door style specifications length, according to the site of the first door civil construction schedule, purchase door unit to do the following several work:
(1)确定传达室内控制盒的位置,即操纵伸缩门开关的装置位置;
(1) determine the convey indoor control box position, namely the operation retractable door switch device position;
(2)将220V电源引到控制盒的位置下端,要求最好是再带1根接地线,粗细规格为1.37,而且有漏电保护装置,并采用PVC暗敷;
(2) the 220V power supply led to the lower end position control box, demand the best is to take 1 wire specifications, thickness is 1.37, and leakage protection device, and uses the PVC dark enough;
(3)预留¢32mm PVC管道,从控制盒的位置下端往下至地平面以下,穿墙往外,至轨道大致位置地平面下0.1-0.15米处,供以后伸缩门室外线路入室
(3) reserve of 32mm PVC pipeline, from the lower end position of the control box down to below ground level through the wall to the outside, to track the approximate location of the ground plane of 0.1-0.15 meters, for later expansion door outdoor line break
(4)按照得出门洞长度,砌门洞时洞宽内净空不小于0.75-0.8米,高度内净尺寸普通门不小于门高+0.25米,豪华门不小于门高+0.1米;门洞末端里侧中上端留宽0.4米,高0.6米检修孔,有条件的可将门洞总长度再加长0.2-0.3米,这样可将检修孔改成一扇小门,方便日后检修维护伸缩门电气线路;
(4) in accordance with the out door hole hole length, built when the wide inner clearance of not less than 0.75-0.8 meters, height not less than the net size of the ordinary door door +0.25 meters high, the door luxury door not less than +0.1 meters high; the upper end of the side door in the left 0.4 meters wide, 0.6 meters high manhole, conditional can the total length of the door hole added 0.2-0.3 m, such that the maintenance of Kong Gaicheng a small door, to facilitate future maintenance maintenance of the electric line telescopic door;
(5)在铺设济南电动门 http://www.sdwoerde.com/ 轨道前除留下约0.8-0.9米宽外,先做好两边的地面;2-3日(冬天5-7日)后,再在铺设轨道的同时,土建配合做好轨道处的地面,注意铺设轨道期间,路面禁止通行,以免压弯轨道;
(5) in the laying of Ji'nan electric door track before except leave about 0.8-0.9 meters wide, first do a good job on both sides of the ground; 2-3 (winter 5-7 days), and then in the laying of track at the same time, the civil cooperate in orbital floor, pay attention to laying the track during the road closed to traffic, so as to avoid bending track;
(6)安装济南电动门,接好线路,调试开关控制盒。
(6) installation of Ji'nan electric door, connected line, debugging switch control box.